600 kW Install on a 280-Room Midlands Conference Hotel
- System size
- 600 kW
- Annual saving
- £140,000
- Payback
- 3.6 years
- Location
- West Midlands
Modelled worked example — the figures below are built from sourced 2026 UK cost and generation benchmarks for a property of this profile, not a claimed client project.
The hotel
A 280-room independent conference and convention hotel in the West Midlands with substantial corporate-events business (40% of annual revenue), full-service F&B, leisure facilities, and 24/7 operation. Annual electricity spend £620,000. Owner-operator with strong sustainability commitment driven by corporate-events RFP demands.
The brief
Deploy a large-scale rooftop solar array to materially reduce operating cost and generate the venue sustainability evidence pack needed for major corporate-events RFPs (FTSE 100 firms, Big 4 accounting, major law firms).
The modelled system
600 kW rooftop array across the property’s three accommodation blocks plus the conference centre roof. 1,100 Tier-1 JA Solar 545W panels, central inverters with full monitoring integration. UPS coordination with the conference centre AV infrastructure to prevent frequency-sync trips during peak generation. Capital purchase with AIA tax shield + 50% FYA above the £1m AIA cap.
The numbers at year one
- Annual generation: 555,000 kWh
- Self-consumption: 93%
- Year-1 saving: £140,000
- Capex: £510,000 gross; £382,500 after AIA + FYA shield
- Effective payback: 2.7 years
We reply by email
Send your hotel details
Tell us the hotel type, room count and postcode. We read every enquiry and reply by email with the published figures and questions that apply to your building. No installer is named and no site visit is booked.
- ✓ Independent publisher: no panel brand, no commission
- ✓ Figures on this site carry a source and a date
- ✓ Your details are used only to reply to this enquiry